Search the app
Go to any screen in the demo or run an action.
Line efficiency (OEE)
Availability, performance and quality by shift, the stops on a timeline and their causes in a Pareto chart.
Line 1PRS-01 · CNV-01Hydraulic press 1 and conveyor line 1
Oct 1 – Oct 14 · Data up to 6:00 AM today, when the night shift closed.
Shift timeline
The shift minute by minute. Walk it with the arrow keys and open a stop with Enter.
Morning shift, Wed, Oct 14
- Running
- Slow running
- Planned stop
- Unplanned stop
- Break
- Shift OEE
- 45.1%
- Availability
- 52.9%
- Performance
- 87.8%
- Quality
- 97.1%
- Parts
- 3,481
- Stops
- 3 h 32 min
Selected stretch
Slow running, from 6:00 AM to 7:10 AM, 1 h 10 min
CNV-01 · Conveyor line 1 · At 70% of the ideal speed · The belts slip under load; the line runs slower so they do not snap.
Parts per hour
- Parts
- Ideal rate · 1,000 pcs/h
| Hour | Parts |
|---|---|
| 6:00 AM – 7:00 AM | 700 |
| 7:00 AM – 8:00 AM | 116 |
| 8:00 AM – 9:00 AM | 0 |
| 9:00 AM – 10:00 AM | 291 |
| 10:00 AM – 11:00 AM | 549 |
| 11:00 AM – 12:00 PM | 468 |
| 12:00 PM – 1:00 PM | 630 |
| 1:00 PM – 2:00 PM | 727 |
The shift's stops and slow running
Stop log
| Oct 154:05 AM | 9 min | No particular asset | Oct 15 · 4:05 AM · 9 minUnclassifiedNo particular assetNightAutomatic | Night | Automatic | |
| Oct 1411:41 PM | 11 min | CNV-01Conveyor line 1 | Oct 14 · 11:41 PM · 11 minJamCNV-01 · Conveyor line 1NightAutomatic | Night | Automatic | |
| Oct 144:22 PM | 11 min | PRS-01Hydraulic press 1 | Oct 14 · 4:22 PM · 11 minUnclassifiedPRS-01 · Hydraulic press 1AfternoonAutomatic | Afternoon | Automatic | |
| Oct 142:26 PM | 43 min | PRS-01Hydraulic press 1 | Oct 14 · 2:26 PM · 43 minBreakdownPRS-01 · Hydraulic press 1AfternoonAutomatic | Afternoon | Automatic | |
| Oct 141:35 PM | 15 min | No particular asset | Oct 14 · 1:35 PM · 15 minNo materialNo particular assetMorningAutomatic | Morning | Automatic | |
| Oct 1412:27 PM | 20 min | PRS-01Hydraulic press 1 | Oct 14 · 12:27 PM · 20 minDie changePRS-01 · Hydraulic press 1MorningCamila Quesada | Morning | Camila Quesada | |
| Oct 1410:23 AM | 12 min | CNV-01Conveyor line 1 | Oct 14 · 10:23 AM · 12 minJamCNV-01 · Conveyor line 1MorningAutomatic | Morning | Automatic | |
| Oct 149:58 AM | 15 min | CNV-01Conveyor line 1 | Oct 14 · 9:58 AM · 15 minJamCNV-01 · Conveyor line 1MorningAutomatic | Morning | Automatic | |
| Oct 147:10 AM | 2 h 30 min | CNV-01Conveyor line 1 | Oct 14 · 7:10 AM · 2 h 30 minBreakdownCNV-01 · Conveyor line 1MorningAutomatic | Morning | Automatic | |
| Oct 142:09 AM | 11 min | No particular asset | Oct 14 · 2:09 AM · 11 minNo operatorNo particular assetNightAutomatic | Night | Automatic |
1–10 of 110 stops
1–10 of 110 stops
Page 1 of 11
OEE and its three factors
- OEEOverall equipment effectiveness
79.2%
87.7% × 91.9% × 98.2%
On targetTarget 75.0%+4.2 ptsvs. 75.0% the previous 14 daysFrom 84.7% on Oct 1 to 71.5% on Oct 14; the target is 75.0%. Chart data: OEE by day over the last 14 days Day OEE Oct 1 84.7% Oct 2 84.3% Oct 3 76.1% Oct 4 86.2% Oct 5 77.8% Oct 6 73.8% Oct 7 74.2% Oct 8 86.1% Oct 9 82.5% Oct 10 79.4% Oct 11 82.9% Oct 12 84.3% Oct 13 64.9% Oct 14 71.5% - AvailabilityRun time against planned time
87.7%
Below targetTarget 88.0%+6.1 ptsvs. 81.6% the previous 14 daysFrom 91.8% on Oct 1 to 78.8% on Oct 14; the target is 88.0%. Chart data: Availability by day over the last 14 days Day Availability Oct 1 91.8% Oct 2 91.2% Oct 3 82.6% Oct 4 92.1% Oct 5 84.5% Oct 6 91.7% Oct 7 80.8% Oct 8 92.7% Oct 9 89.9% Oct 10 89.3% Oct 11 89.1% Oct 12 90.1% Oct 13 83.8% Oct 14 78.8% - PerformanceActual rate against the ideal
91.9%
On targetTarget 88.0%−1.6 ptsvs. 93.4% the previous 14 daysFrom 93.8% on Oct 1 to 92.4% on Oct 14; the target is 88.0%. Chart data: Performance by day over the last 14 days Day Performance Oct 1 93.8% Oct 2 94.0% Oct 3 94.0% Oct 4 94.9% Oct 5 93.7% Oct 6 81.7% Oct 7 93.6% Oct 8 94.5% Oct 9 93.2% Oct 10 90.6% Oct 11 94.7% Oct 12 95.2% Oct 13 79.3% Oct 14 92.4% - QualityParts right the first time
98.2%
On targetTarget 97.0%−0.1 ptsvs. 98.3% the previous 14 daysFrom 98.3% on Oct 1 to 98.2% on Oct 14; the target is 97.0%. Chart data: Quality by day over the last 14 days Day Quality Oct 1 98.3% Oct 2 98.3% Oct 3 98.0% Oct 4 98.5% Oct 5 98.2% Oct 6 98.5% Oct 7 98.1% Oct 8 98.3% Oct 9 98.3% Oct 10 98.1% Oct 11 98.3% Oct 12 98.3% Oct 13 97.7% Oct 14 98.2%
How it is calculated
The figures for the period and shift chosen, step by step.
Availability
87.7%How much of the planned time was the line running?
- Planned time42 shifts of 8 h, less the 30 min break
- 18,900 min
- Stops610 min planned and 1,706 min unplanned
- − 2,316 min
- Run time
- 16,584 min
Run time ÷ planned time
16,584 min ÷ 18,900 min = 87.7%
Performance
91.9%How fast did it produce while it ran?
- Ideal cycle1,000 pcs/h at most
- 3.6 s
- Total parts
- 253,884 pcs
- Time at the ideal rate253,884 pcs × 3.6 s
- 15,233 min
Time at the ideal rate ÷ run time
15,233 min ÷ 16,584 min = 91.9%
Quality
98.2%How many parts came out right the first time?
- Total parts
- 253,884 pcs
- Scrap
- − 3,339 pcs
- Rework
- − 1,112 pcs
- Good parts
- 249,433 pcs
Good parts ÷ total parts
249,433 pcs ÷ 253,884 pcs = 98.2%
OEE = 87.7% × 91.9% × 98.2% = 79.2%
In other words, 14,966 min of perfect production — at the ideal rate, with no defects — out of 18,900 min planned. Figures are rounded for display; the calculation uses the exact values.
Fictional people, companies and figures. None of it describes Agora Labs or any client.