Search the app
Go to any screen in the demo or run an action.
Maintenance
Work orders, a preventive plan for each asset, and close-out with a checklist, photo and sign-off.
Maintenance figures
- Open work orders
12
- 9 waiting
- 2 in progress
- 1 on hold
- Overdue
3
The oldest fell due last week.
- Planned vs reactive
50%
+6 pts44% in September- Preventive 8
- Corrective 8
- Mean time to repairMTTR
2.1 h
-17.7%2.6 h in SeptemberFrom 3.4 h in May to 2.1 h in Oct. Chart data: Mean time to repair over the last six months Month Hours May 3.4 h Jun 3.1 h Jul 2.9 h Aug 2.8 h Sep 2.6 h Oct 2.1 h - Mean time between failuresMTBF
275 h
+11%248 h in SeptemberFrom 212 h in May to 275 h in Oct. Chart data: Mean time between failures over the last six months Month Hours May 212 h Jun 220 h Jul 231 h Aug 240 h Sep 248 h Oct 275 h - Preventive compliance
80%
−6 pts86% the period before8 of 10 routines in the last four weeks
Work orders
| WO-2499 | WO-2499CorrectiveCorrectivePRS-01Hydraulic press 1HighDHDiego HerreraWaitingHighPRS-01Hydraulic press 1DHDiego Herrera | PRS-01Hydraulic press 1 | High | Waiting | DHDiego Herrera | tomorrow |
| WO-2498 | WO-2498PreventivePreventiveBLR-01Boiler 1MediumMRMateo RojasWaitingMediumBLR-01Boiler 1MRMateo Rojas | BLR-01Boiler 1 | Medium | Waiting | MRMateo Rojas | in 2 weeks |
| WO-2497 | WO-2497PreventivePreventiveCNV-01Conveyor line 1MediumMRMateo RojasWaitingMediumCNV-01Conveyor line 1MRMateo Rojas | CNV-01Conveyor line 1 | Medium | Waiting | MRMateo Rojas | in 2 weeks |
| WO-2496 | WO-2496PreventivePreventiveCMP-02Compressor 2MediumDHDiego HerreraWaitingMediumCMP-02Compressor 2DHDiego Herrera | CMP-02Compressor 2 | Medium | Waiting | DHDiego Herrera | in 2 weeks |
| WO-2495 | WO-2495CorrectiveCorrectivePMP-04Pump 4UrgentDHDiego HerreraOn holdUrgentPMP-04Pump 4DHDiego Herrera | PMP-04Pump 4 | Urgent | On hold | DHDiego Herrera | today |
| WO-2494 | WO-2494CorrectiveCorrectiveCNV-01Conveyor line 1UrgentDHDiego HerreraIn progressUrgentCNV-01Conveyor line 1DHDiego Herrera | CNV-01Conveyor line 1 | Urgent | In progress | DHDiego Herrera | today |
| WO-2493 | WO-2493CorrectiveCorrectiveCMP-02Compressor 2MediumMRMateo RojasWaitingMediumCMP-02Compressor 2MRMateo Rojas | CMP-02Compressor 2 | Medium | Waiting | MRMateo Rojas | overdue, yesterday |
| WO-2492 | WO-2492CorrectiveCorrectiveHVC-02Cold-room HVAC 2HighMRMateo RojasIn progressHighHVC-02Cold-room HVAC 2MRMateo Rojas | HVC-02Cold-room HVAC 2 | High | In progress | MRMateo Rojas | today |
| WO-2491 | WO-2491CorrectiveCorrectivePMP-04Pump 4MediumDHDiego HerreraClosedMediumPMP-04Pump 4DHDiego Herrera | PMP-04Pump 4 | Medium | Closed | DHDiego Herrera | |
| WO-2490 | WO-2490PreventivePreventivePMP-04Pump 4MediumDHDiego HerreraWaitingMediumPMP-04Pump 4DHDiego Herrera | PMP-04Pump 4 | Medium | Waiting | DHDiego Herrera | in 4 days |
1–10 of 29 orders
1–10 of 29 orders
Page 1 of 3
Preventive plan
Each asset's routine, week by week. Choose a cell to open its order or generate it.
- Done
- Overdue
- Has an order
- To generate
8 of 10 routines done in the last four weeks · . 18 routines to generate
Use the arrow keys to move between routines and Enter to open one.
| Asset and routine | Week 40, from Sep 28W40Sep 28 | Week 41, from Oct 5W41Oct 5 | Week 42, from Oct 12W42Oct 12, This week | Week 43, from Oct 19W43Oct 19 | Week 44, from Oct 26W44Oct 26 | Week 45, from Nov 2W45Nov 2 | Week 46, from Nov 9W46Nov 9 | Week 47, from Nov 16W47Nov 16 | Week 48, from Nov 23W48Nov 23 | Week 49, from Nov 30W49Nov 30 | Week 50, from Dec 7W50Dec 7 | Week 51, from Dec 14W51Dec 14 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| CMP-02Compressor 2Compressor 2Every 4 weeks · Air filter change and condensate drain | ||||||||||||
| CNV-01Conveyor line 1Conveyor line 1Every week · Line 1 lubrication and tensioning | ||||||||||||
| PRS-01Hydraulic press 1Hydraulic press 1Every 4 weeks · Hydraulic system inspection | ||||||||||||
| PMP-04Pump 4Pump 4Every 3 weeks · Greasing and vibration check | ||||||||||||
| BLR-01Boiler 1Boiler 1Every 2 weeks · Burner inspection and blowdown | ||||||||||||
| FLT-03Forklift 3Forklift 3Every 6 weeks · 250-hour service | ||||||||||||
| HVC-02Cold-room HVAC 2Cold-room HVAC 2Every 4 weeks · Condenser cleaning and refrigerant check |
Assets
- 4 running
- 1 down
- 2 in maintenance
- Running
Compressor 2
CMP-02·Production
- Criticality
- Medium
- Open orders
- 2 open1 overdue
- Last maintenance
- 2 weeks ago
- Next maintenance
- in 2 weeks
Every 4 weeks · Air filter change and condensate drain
- In maintenance
Conveyor line 1
CNV-01·Packaging
- Criticality
- High
- Open orders
- 3 open
- Last maintenance
- 2 days ago
- Next maintenance
- in 5 days
Every week · Line 1 lubrication and tensioning
- Running
Hydraulic press 1
PRS-01·Production
- Criticality
- High
- Open orders
- 2 open1 overdue
- Last maintenance
- 3 weeks ago
- Next maintenance
- overdue, yesterday
Every 4 weeks · Hydraulic system inspection
- Down
Pump 4
PMP-04·Utilities
- Criticality
- Medium
- Open orders
- 2 open
- Last maintenance
- 5 days ago
- Next maintenance
- in 4 days
Every 3 weeks · Greasing and vibration check
- Running
Boiler 1
BLR-01·Utilities
- Criticality
- High
- Open orders
- 1 open
- Last maintenance
- 2 days ago
- Next maintenance
- in 2 weeks
Every 2 weeks · Burner inspection and blowdown
- Running
Forklift 3
FLT-03·Warehouse
- Criticality
- Low
- Open orders
- 1 open1 overdue
- Last maintenance
- 3 weeks ago
- Next maintenance
- overdue, last week
Every 6 weeks · 250-hour service
- In maintenance
Cold-room HVAC 2
HVC-02·Storage
- Criticality
- Medium
- Open orders
- 1 open
- Last maintenance
- 6 days ago
- Next maintenance
- in 3 weeks
Every 4 weeks · Condenser cleaning and refrigerant check
Fictional people, companies and figures. None of it describes Agora Labs or any client.