Skip to content

Search the app

Go to any screen in the demo or run an action.

Maintenance

Work orders, a preventive plan for each asset, and close-out with a checklist, photo and sign-off.

Sample data

Maintenance figures

Open work orders

12

  • 9 waiting
  • 2 in progress
  • 1 on hold
Overdue

3

The oldest fell due last week.

Planned vs reactive

50%

+6 pts44% in September
  • Preventive 8
  • Corrective 8
Mean time to repair

2.1 h

-17.7%2.6 h in September
From 3.4 h in May to 2.1 h in Oct.
Chart data: Mean time to repair over the last six months
MonthHours
May3.4 h
Jun3.1 h
Jul2.9 h
Aug2.8 h
Sep2.6 h
Oct2.1 h
Mean time between failures

275 h

+11%248 h in September
From 212 h in May to 275 h in Oct.
Chart data: Mean time between failures over the last six months
MonthHours
May212 h
Jun220 h
Jul231 h
Aug240 h
Sep248 h
Oct275 h
Preventive compliance

80%

−6 pts86% the period before

8 of 10 routines in the last four weeks

Work orders

The plant's work orders
WO-2499
WO-2499CorrectiveWaitingHighPRS-01Hydraulic press 1Diego Herrera
PRS-01Hydraulic press 1
High
Waiting
Diego Herrera
tomorrow
WO-2498
WO-2498PreventiveWaitingMediumBLR-01Boiler 1Mateo Rojas
BLR-01Boiler 1
Medium
Waiting
Mateo Rojas
in 2 weeks
WO-2497
WO-2497PreventiveWaitingMediumCNV-01Conveyor line 1Mateo Rojas
CNV-01Conveyor line 1
Medium
Waiting
Mateo Rojas
in 2 weeks
WO-2496
WO-2496PreventiveWaitingMediumCMP-02Compressor 2Diego Herrera
CMP-02Compressor 2
Medium
Waiting
Diego Herrera
in 2 weeks
WO-2495
WO-2495CorrectiveOn holdUrgentPMP-04Pump 4Diego Herrera
PMP-04Pump 4
Urgent
On hold
Diego Herrera
today
WO-2494
WO-2494CorrectiveIn progressUrgentCNV-01Conveyor line 1Diego Herrera
CNV-01Conveyor line 1
Urgent
In progress
Diego Herrera
today
WO-2493
WO-2493CorrectiveWaitingMediumCMP-02Compressor 2Mateo Rojas
CMP-02Compressor 2
Medium
Waiting
Mateo Rojas
overdue, yesterday
WO-2492
WO-2492CorrectiveIn progressHighHVC-02Cold-room HVAC 2Mateo Rojas
HVC-02Cold-room HVAC 2
High
In progress
Mateo Rojas
today
WO-2491
WO-2491CorrectiveClosedMediumPMP-04Pump 4Diego Herrera
PMP-04Pump 4
Medium
Closed
Diego Herrera
WO-2490
WO-2490PreventiveWaitingMediumPMP-04Pump 4Diego Herrera
PMP-04Pump 4
Medium
Waiting
Diego Herrera
in 4 days

1–10 of 29 orders

Page 1 of 3

Preventive plan

Each asset's routine, week by week. Choose a cell to open its order or generate it.

Horizon
  • Done
  • Overdue
  • Has an order
  • To generate

8 of 10 routines done in the last four weeks. 18 routines to generate

Use the arrow keys to move between routines and Enter to open one.

Preventive plan by asset and week
Asset and routineWeek 40, from Sep 28Week 41, from Oct 5Week 42, from Oct 12, This weekWeek 43, from Oct 19Week 44, from Oct 26Week 45, from Nov 2Week 46, from Nov 9Week 47, from Nov 16Week 48, from Nov 23Week 49, from Nov 30Week 50, from Dec 7Week 51, from Dec 14
CMP-02Compressor 2
CNV-01Conveyor line 1
PRS-01Hydraulic press 1
PMP-04Pump 4
BLR-01Boiler 1
FLT-03Forklift 3
HVC-02Cold-room HVAC 2

Assets

  • 4 running
  • 1 down
  • 2 in maintenance
  • Compressor 2

    CMP-02Production

    Running
    Criticality
    Medium
    Open orders
    2 open1 overdue
    Last maintenance
    2 weeks ago
    Next maintenance
    in 2 weeks

    Every 4 weeks · Air filter change and condensate drain

  • Conveyor line 1

    CNV-01Packaging

    In maintenance
    Criticality
    High
    Open orders
    3 open
    Last maintenance
    2 days ago
    Next maintenance
    in 5 days

    Every week · Line 1 lubrication and tensioning

  • Hydraulic press 1

    PRS-01Production

    Running
    Criticality
    High
    Open orders
    2 open1 overdue
    Last maintenance
    3 weeks ago
    Next maintenance
    overdue, yesterday

    Every 4 weeks · Hydraulic system inspection

  • Pump 4

    PMP-04Utilities

    Down
    Criticality
    Medium
    Open orders
    2 open
    Last maintenance
    5 days ago
    Next maintenance
    in 4 days

    Every 3 weeks · Greasing and vibration check

  • Boiler 1

    BLR-01Utilities

    Running
    Criticality
    High
    Open orders
    1 open
    Last maintenance
    2 days ago
    Next maintenance
    in 2 weeks

    Every 2 weeks · Burner inspection and blowdown

  • Forklift 3

    FLT-03Warehouse

    Running
    Criticality
    Low
    Open orders
    1 open1 overdue
    Last maintenance
    3 weeks ago
    Next maintenance
    overdue, last week

    Every 6 weeks · 250-hour service

  • Cold-room HVAC 2

    HVC-02Storage

    In maintenance
    Criticality
    Medium
    Open orders
    1 open
    Last maintenance
    6 days ago
    Next maintenance
    in 3 weeks

    Every 4 weeks · Condenser cleaning and refrigerant check

Fictional people, companies and figures. None of it describes Agora Labs or any client.